Method of Setting up the Para-flexible MPS in Leather Manufacturing Factory

JIANG Si-ding,ZHANG Yun,CHEN Zi-chen,ZHANG Ling
DOI: https://doi.org/10.19495/j.cnki.1007-5429.2006.03.021
2006-01-01
Abstract:Aiming for the actual production of leather manufacturing factories and the limitation of the method of setting up MPS in current commercial software,a new mothed of drawing up para-flexible MPS is put forward by combining the fixed period planning method with order-based planning method.Also,the model of planning process for MPS has been designed with Petri network.Finally an actual application example is given.
What problem does this paper attempt to address?