Transmission Network Planning Considering Weather Disaster

CHEN Hao-yong,HU Bin,YE Rong
2009-01-01
Abstract:To resolve the contradiction between enhancing anti-disaster ability of power network and sustaining rational construction cost, by means of leading in discrepant decision variables and corresponding to discrepant anti-disaster ability and construction cost a multi-objective power network planning model is built in which the meteorological disaster factor is taken into account, and the solving method based on Monte Carlo simulation and multi-objective genetic algorithm, namely NSGA-Ⅱ, is given. The necessity of considering meteorological disaster factor during power network planning is proved by Graver 6-bus system. Using the proposed method, the planning scheme in which considers both economy and reliability can be obtained, so it is suitable to the power network planning for the region where disasters frequently occur.
What problem does this paper attempt to address?