Reconstruction and Commissioning of Leachate Treatment Project in Waste Incineration Plant

Zhi-cong HUANG,Xiao-jun WANG
DOI: https://doi.org/10.3969/j.issn.1000-4602.2012.24.024
2012-01-01
Abstract:A/O-two-stage Fenton/BAF process was used to reconstruct the leachate treatment system of a waste incineration power plant in Guangdong Province.The results indicated that the treatment efficiency and stability of A/O unit could be improved by aerobic reflux.When the total reflux radio was 1 ∶ 2,the average concentrations of the effluent COD and ammonia nitrogen were about 1 100 mg/L and 50 mg/L respectively,and the corresponding removal rates were all over 95%.The dosages of H2O2(27.5%) in two-stage Fenton unit were 4 mL/L and 1 mL/L respectively,while the dosages of FeSO4 were 8 g/L and 2 g/L respectively.When the HRTs of two-stage BAF were 8 h and 5 h respectively,the effluent COD,ammonia nitrogen,color and SS were less than 90 mg/L,3 mg/L,25 times and 15 mg/L respectively,meeting the first class criteria(the second period) of the Guangdong Province local standard Discharge Limits of Water Pollutants(DB 44/26-2001).
What problem does this paper attempt to address?