Assessment approach for flood resources availability and utilization potentiality and its application

胡庆芳,王银堂,杨大文
2010-01-01
Abstract:This paper proposes definitions of flood resources availability and flood resources utilization potentiality,and presents an interpretation for the first time by a synthetic consideration of the restrictive factors in flood regulation capacity and river necessary water demand during flood season,aiming to establish a harmony relationship among flood resources utilization,flood disaster control and river eco-environment protection.An assessment approach is developed for flood resources availability and utilization potentiality,which provide two indexes for the evaluation of flood utilization.In addition,some related conceptions are illustrated and discussed.A case study of the Baisanhe river basin shows that the flood resources availability and utilization potentiality of this basin in the period of 1980-2000 was 1.029 and 0.132 billion m3,respectively.The utilization potentiality of this period was concentrated on a period of several years and the actual resources use frequently exceeded the availability.Thus,the flood use potentiality of this basin was rather limited and the utilization condition was relatively irrational,particularly in terms of river necessary water demand.An enhanced ability of flood control and a guaranteed river necessary eco-environment water demand are required to improve the flood utilization of this basin in the future.
What problem does this paper attempt to address?