Prediction of Domestic Waste Output Based on ARIMA Model

Wu Lingling,Lu Jiawei,Liao Li,Jiang Jiansheng
DOI: https://doi.org/10.3969/j.issn.1005-8206.2013.05.001
2013-01-01
Abstract:Based on the monthly data of domestic waste generation in one district of Shenzhen from 2004 to 2012, an ARIMA model of time series analysis was established. By contrast of the modeling results of different yearly data, the forecast period was identified to be 12 months. The monthly output of domestic waste in 2013 was forecast by using SPSS 19 software.The output of domestic waste was forecast to be 1. 993 6 million tons in this district in 2013, with 14. 38% increase rate on the basis of the output in 2012.
What problem does this paper attempt to address?