EXPERIMENTAL RESEARCH ON AVAILABILITY OF DEWATERING DREDGED SEDIMENT

ZHANG Xiao-lu,HE Sheng-bing,ZHANG Mei-lan,CHEN Xue-chu,KONG Hai-nan
DOI: https://doi.org/10.16796/j.cnki.1000-3770.2008.12.014
2008-01-01
Abstract:Ferric trichloride and PAM were used to dewater the dredged sediment.The test results revealed that the volume of dredged sediment contain-ing 85% water could be reduced by about 50% in 100 minutes under the condition of dosing Ferric trichloride 250 mg·L-1 and PAM 10 mg·L-1, and the supernatant quality could meet the discharge standard of first-rate A issued in GB18918-2002.The dewatered sediment dried in nature state for 60 days, the bearing load reached 100 kPa and could be used as plant soil.In addition, it was calculated that the operating cost for dewatering dredged sediment was about 3.47 yuan, which also supplied a feasibility way for treating and utilizing dredged sediment.