PILOT PLANT TEST ON NAPROXEN PRODUCTION WASTEWATER TREATMENT BY ELECTROLYSIS/FLOCCULATION -UASB-MBR COMBINED TECHNOLOGY

Yang Yunjun,Ding Yuanhong,Ren Hongqiang
2009-01-01
Abstract:Naproxen production wastewater was treated by electrolysis/flocculation -UASB-MBR combined technology. The results indicated: removal rate of COD was 20% with voltage of 4.1V, COD of 15 000 mg·L-1; 20% removal rate of COD could be obtained by adding mixture of pol y-ferric-sulphate Coagulant and PAM which ratio was 500:2;removal rate of COD reached 75.8%~ 80% by UASB unit and COD became 2 000 mg·L-1; at last COD concentration became less 100 mg·L-1 after MBR unit.
What problem does this paper attempt to address?