Formal modeling and checking of procedure message exchange between train-ground for CTCS level 3

LIU Zhongtian,LU Jidong,SUN Weiliang
DOI: https://doi.org/10.3969/j.issn.1673-0291.2011.02.014
2011-01-01
Abstract:It is confirmed that the chinese train control system(CTCS) level 3 is adopted in newly-built railway lines,where the train speed is expected to exceed 300 kilometers per hour.Procedure message exchange between train and ground is one of the most significant factors that affect the transportation efficiency,reliability and safety of the CTCS level 3.It is very important to use time automata for formal modeling and checking of procedure message exchange between train and ground.Firstly,we divide procedure message exchange between train and ground there are four typical sub-procedures between train and ground: procedure start of mission,procedure train movement,procedure RBC handover,procedure end of mission.Secondly,the time automata models of RBC,ATP and GSM-R are established according to the procedures.Finally,the formal analysis by the UPPAAL tool show that the procedure message exchange between train and ground is provided with security and restricted activity.
What problem does this paper attempt to address?