Replacement of water bodies by tidal prism of Nantong urban river and effect estimation

GAO Xiao-qin,ZHANG Jin-chi,SHEN Bo
2008-01-01
Abstract:In consideration of the characteristics of the plain tidal river network in Nantong City,a circulation project to replace of water bodies of Nantong urban river was made using the current situation of water flow,abundant water resource and tide dynamics of the plain tidal river network.The mode of the project adopts tide continuance diversion and pump interval diversion.According to the current water flow,a workable project of Diverting Water to Flush out Pollutants was established for improving water quality in urban rivers of Nantong plain tidal river network.The capability of area diversion,the option of diversion route,calculation and demonstration of diversion time and amount and the effects after the replacement of water bodies were studied in this paper.It was favorable for aquatic life migration due to increase of landscape connectivity.The whole water system network structure was formed.It also improved the level of material exchange and energy circulating,and enhanced the river's bearing capacity.
What problem does this paper attempt to address?