Risk early-warning method to repair and construct operations engineering based on improved P-S model

HE Lei,WANG Feng-shan,CHEN Yan,LIU Yuan
DOI: https://doi.org/10.3969/j.issn.1009-3443.2012.02.012
2012-01-01
Abstract:To the mental characteristics about "Lower risk possibility,Higher safety satisfaction",a risk early-warning method was proposed to repair and construct operations for earthquake-damaged engineering with the improved P-S model.Based on the Possibility-satisfaction principle,the risk early-warning method was erected,with its early-warning grade plotted out,and its possibility function and satisfactory function presented in the corresponding early-warning layer.As opposite changing characteristic was analyzed in the possibility and satisfactory functions,the formal expression was given in the merging process of the early-warning possibility-satisfaction.Data envelopment analysis(DEA) improved the early-warning P-S model,and the relative early-warning possibility-satisfaction model was established to repair and construct operations for earthquake-damaged engineering.The model was applied into the whole risk early-warning case in the repairing process on rock slope,whose outcome indicated the rationality and feasibility,revealing its better early-warning ability.
What problem does this paper attempt to address?