NUMERICAL SIMULATION OF PHASE Ⅱ REHABILITATION PROJECT FOR SUZHOU CREEK

LU Shi-qiang,LIN Wei-qing,XU Zu-xin,LIAO Zhen-liang
DOI: https://doi.org/10.3969/j.issn.1004-8227.2006.02.019
2006-01-01
Abstract:This paper at first introduced the general situation of Suzhou Creek,the Rehabilitation Project of Suzhou Creek and its achievement of Phase I.Then the emphasis of Phase II was proposed.Based on the hydrodynamics and water quality models of the Suzhou Creek,Phase II of Suzhou Creek Rehabilitation Project was simulated and analyzed.Pollution interception,sludge dredging and water augmentation were all included in the scenario study.Through simulation and results analysis,the reasonability and feasibility of the target of Rehabilitation Project Phase II was demonstrated.