Calculation of Pulling Force of Boring Head in Rectangular Box Culverts Jacking-pulling Construction

QIAO Hua-shan,YANG Shu-qi,ZHANG Zhi-yong,WANG Zhong-bing
DOI: https://doi.org/10.3969/j.issn.1672-7428.2012.04.015
2012-01-01
Abstract:The paper systematically introduced the calculation method of pulling force in axial direction deviation rectification of boring head and retraction control during boring intermittent in rectangular box culverts jacking-pulling construction with engineering example.Based on the theoretical analysis and relative calculation formula,accurate results can be obtained for jacking-pull construction with rectangular box culverts.
What problem does this paper attempt to address?