Strength Analysis of a Certain 350 ft Jack-up Offshore Platform Jacking System in Emergency Lifting Process under Different Working Conditions
ZHANG Dapeng,YAN Jin,ZHAO Bowen,WANG Shaopeng,ZHU Keqiang
DOI: https://doi.org/10.3969/j.issn.2095-6622.2022.05.010
2022-01-01
Abstract:Referring to the specific technical parameters of the lifting device of a certain 350 ft jack-up offshore platform,combining the specific operation process of the device,the finite element analysis model of the device is established by the finite element analysis software ABAQUS,the strength analysis of the device under the normal/emergency working conditions in the lifting process is made,and the contact stress,bending stress of the lifting device and its components.The conclusions obtained from the calculation and analysis have certain guiding significance for the design,manufacture and management of the platform lifting device.