Integrated multi-objective optimization method for equal lot splitting flexible job-shop scheduling problem

Qiang ZENG,Ling SHEN,Yu YANG,Hongna SONG
DOI: https://doi.org/10.3778/j.issn.1002-8331.2012.16.053
2012-01-01
Abstract:Aiming at the multi-objective optimization problem for the equal lot splitting flexible job-shop scheduling,an integrated optimization method is proposed.Firstly,a multi-objective optimization model is established with the objective to minimize the makespan and minimize the manufacturing cost.Then,an improved Non-dominated Sorting Genetic Algorithm II(NSGA II)is presented and designed to solve the model.In the algorithm,an object-oriented technique is introduced to deal with the complicated logical relation between different entities,a three-segment encoding technique is used to encode the lot splitting scheme,the process sequences and machines,a three-segment hybrid crossover and mutation operator is used to implement genetic evolution,and two delicacy scheduling techniques are applied to reduce the flow time of each sub-batch.Finally,the effectiveness of the scheduling method proposed is validated by case study.
What problem does this paper attempt to address?