Research on Temperature Upturn of Dam Concrete in Transportation and Pouring Process

HAN Yan,OUYANG Jianshu,HUANG Dahai
2010-01-01
Abstract:Taking the Xiluodu hydropower station project for an example,this paper analyzes the influence of various transportation modes and haulage time for dam concrete pouring in summer on concrete placement temperature by using numerical simulation method.And then temperature upturn in the concrete pouring process is also calculated.The results show that the values of temperature upturn in the whole process of transportation and pouring can be determined accurately.Thus,it provides reliable references for formulation the pre-cooling scheme of outlet temperature and control of temperature during the concrete construction period.
What problem does this paper attempt to address?