Determination of Interruptible Load as an Ancillary Service in a Coordinated Multi-Commodity Market

Peng Wang,Yong Liu,Yi Ding,Yu Xiao
2005-01-01
Abstract:This paper studies the problem of the reliability-constrained generation and ancillary service dispatch including interruptible load in a spot market. An OPF-based technique for simultaneous scheduling of generation and ancillary services (AS) is proposed. Instead of using the deterministic system reserve criterion, a probabilistic reserve criterion based on the required reliability index is introduced and derived as reserve constraint. The reliability test system RBTS is used to illustrate the technique.
What problem does this paper attempt to address?