Medium-length hole and delay strengthening loosing blasting method of bench type

李磊,沈兆武,马宏昊,蒋耀港
DOI: https://doi.org/10.3969/j.issn.1006-7051.2010.03.009
2010-01-01
Abstract:Regarding the design case of hill body blasting engineering,it discussed bore hole's arrangements and medium-length hole millisecond strengthening loosing blasting construction design idea,and brought forward the methods of determining such blasting parameters as hole row margin,unit explosive assumption,charging structure and initiation patterns.Based on the non-electric blasting network of inside and outside hole combining delay employed in the project case,single hole initiation was achieved successfully.The vibration measurement data showed that blasting vibration and slungshot had been controlled effectively in this project case,and therefore,good blasting results were reached,which would have some reference value to similar project.