Optimization of Flood Limited Water Level of the Three Gorges Project in Flood Period under the Influence of Xiangjiaba and Xiluodu Projects

李义天,邓金运,甘富万,陈建
2009-01-01
Abstract:It is necessary to optimize the flood limited water level of Three Gorge Project (TGP) to meet the increasing needs of energy,water resource and the changes of water,sediment inflow caused by dams of Xiangjiaba and Xiluodu projects which are being constructed on upstream reach.This paper analyzes the optimizing method and examines the flood and navigation constraints of optimization in the periad of operation of Xiangjiaba and Xiluodu reservoirs.On the basis of design operation,the optimized flood limited water level under flood and navigation constraints is obtained.The optimization increases the comprehensive benefits of TGP greatly,it can be used for reference of the TGP operation.