Probabilistic Lifetime Assessment of Marine Reinforced Concrete with Steel Corrosion and Cover Cracking

Chun-hua Lu,Wei-liang Jin,Rong-gui Liu
DOI: https://doi.org/10.1007/s13344-011-0025-6
IF: 1.253
2011-01-01
China Ocean Engineering
Abstract:In order to study the durability behavior of marine reinforced concrete structure suffering from chloride attack, the structural service life is assumed to be divided into three critical stages, which can be characterized by steel corrosion and cover cracking. For each stage, a calculated model used to predict the lifetime is developed. Based on the definition of durability limit state, a probabilistic lifetime model and its time-dependent reliability analytical method are proposed considering the random natures of influencing factors. Then, the probabilistic lifetime prediction models are applied to a bridge pier located in the Hangzhou Bay with Monte Carlo simulation. It is found that the time to corrosion initiation t 0 follows a lognormal distribution, while that the time from corrosion initiation to cover cracking t 1 and the time for crack to develop from hairline crack to a limit crack width t 2 can be described by Weibull distributions. With the permitted failure probability of 5.0%, it is also observed that the structural durability lifetime mainly depends on the durability life t 0 and that the percentage of participation of the life t 0 to the total service life grows from 61.5% to 83.6% when the cover thickness increases from 40 mm to 80 mm. Therefore, for any part of the marine RC bridge, the lifetime predictions and maintenance efforts should also be directed toward controlling the stage of corrosion initiation induced by chloride ion.
What problem does this paper attempt to address?