Research on Optimum Defect Remove Period Based on Joint Maintenance Analysis of Primary Equipments with Protective Relays

Hui-fang WANG,Yi WANG,Ben-teng HE
DOI: https://doi.org/10.3969/j.issn.1674-3415.2011.13.009
2011-01-01
Abstract:The reliable operation of relay protection device is significant for the power system. During maintenance management,we should treat primary equipments and their protective relays as a whole. This paper proposes an optimum defect remove period calculating model based on the joint maintenance of primary equipments with their relays. It analyzes the arrangement of the joint maintenance of the primary equipments and their relays;builds the state space model of the system with single protection based on the joint maintenance;proposes the reliability economic analysis method for the system. Using the proposed model a case study calculates the optimum defect remove period of a transformer,which is based on the objective of minimum annual economic loss and optimum reliability economy. The proposed model can help saving a lot of manpower,material and financial resources,as well as improving equipments' availability and reliability.
What problem does this paper attempt to address?