Method of Product Development Scheduling Based on ProA Hierarchical Decomposition

曹宜英,秦现生,徐显龙
DOI: https://doi.org/10.13196/j.cims.2008.08.35.caoyy.023
2008-01-01
Computer Integrated Manufacturing Systems
Abstract:To realize the dynamic scheduling of product development,a scheduling method based on Activity and its Process(ProA)hierarchical decomposition was presented integrating with product development process modeling.ProA Input and Output Item(ProA Item)and the ProA conversion operations were firstly studied.Time attributes of ProA were discussed and analyzed in detail,and rules for time attributes of ProA were also formulated.Furthermore,a polychromatic sets recurrence element model of product development scheduling was constructed.Finally,the method of the dynamic scheduling was presented,and simulation based on Matlab environments was also conducted.
What problem does this paper attempt to address?