Partner selection method for cross-enterprise project by considering resource confidence

Han-chuan XU,Xiao-fei XU,Ting HE
DOI: https://doi.org/10.13196/j.cims.2010.07.138.xuhch.024
2010-01-01
Computer Integrated Manufacturing Systems
Abstract:To minimize the risk of failure and tardiness of the cross-enterprise project caused by the uncertainties of partner's resources,the conception of resource confidence was introduced, and a partner selection model for cross-enterprise project by considering resource confidence was presented. The key factors and constraints, such as the resource confidence, the sub-project processing time, the precedence of sub-project and the project due date, were considered in the 0-1 integer programming model. By using the characteristics of the problem, a project scheduling algorithm was developed to search and evaluate selection solutions, and the project scheduling algorithm was embedded into a tabu search algorithm to solve the model. Simulation experiments and comparisons to other related algorithms showed that the proposed approach was possible to find the optimal solution with faster speed and higher probability.
What problem does this paper attempt to address?