The ARIMA Model of Guizhou Province Population Time Series

Miao Baiqi
DOI: https://doi.org/10.3969/j.issn.1672-8513.2006.03.009
2006-01-01
Abstract:For national economy and livelihood of the people,it is the important to study, forecast and control population.The Chinese population time series models appeared,but the Guizhou population time series model have not been researched.This paper studies the Guizhou population time series(1952~2002),and establish its ARIMA model with B-J method.It supplies a simple and easily operating statistical method for forecastirg and controlling population..
What problem does this paper attempt to address?