Supporting technique with advanced pipe-shed grouting in extremely complicated faulting zone

ZHAO Yi-xin,JIANG Yao-dong,MENG Lei,WANG Tao,LIU Hua-bo
2013-01-01
Abstract:Based on the application cases of roadways successfully passing through the complicated fault zones by using supporting technique with advanced pipe-shed grouting,the technical problems of roadway support in passing through the extremely complicated fault zone were analyzed firstly in this paper.Meanwhile,the design parameters of advanced pipe-shed grouting were calculated,and the stress and deformation of surrounding rock in the fault zone under various supporting conditions were also analyzed by numerical simulation.Moreover,the in-situ deformation of roadway supported by advanced pipe-shed grouting was measured,and the successful application experiences of the pipe-shed grouting technique were summarized.The practice results show that the supporting technique with pipe-shed grouting can not only improve the integrity of surrounding rock and the supporting capacity,but also form a strong pre-support system.It can be well used as one of effective roadway support techniques in the complicated geological zones.However,some other measures,such as geophysical prospecting,effective in-situ monitoring,et al,are needed to improve the grouting quality and ensure the safety of passing through the complicated fault zones.The experiences in this paer can provide reference to the design and construction of similar projects in complicated geological zones.
What problem does this paper attempt to address?