High Availability(ha) Realizing of Dynamic Soft Reduction Process Control System for Slab Continuous Casting Machine

JI Cheng,ZHAO Qi,ZHU Miao-yong,XIA Jian-chao,CHENG Nai-liang
DOI: https://doi.org/10.3969/j.issn.1000-7059.2007.03.014
2007-01-01
Abstract:The frame with high availability for dynamic soft reduction process control system of No 2 slab continuous casting machine in Meigang is introduced.A HA system frame scheme,combined software malfunction self-recovering with hardware hot-standby redundancy,was presented.Availability of check point data in switchover process of standby computer was analyzed in view of actual production.Finally,results of system bug testing are given.Practice shows that operation of the system is stable and expected goal is reached.