Multiple Time Scales of Bank-Full Discharge in the Yellow River

钟德钰,吴保生,张艳艳
DOI: https://doi.org/10.14042/j.cnki.32.1309.2012.03.018
2012-01-01
Abstract:Under the influence of climate changes,the hydrologic system has the characteristics of multiple time scales.The bank-full discharge,as a function of inflow conditions,also has the characteristics of multiple time scales.This phenomenon was studied based on the observed data of bank-full discharge,flow discharge and sediment concentration at hydrologic stations in the lower Yellow River from 1950-2007.The main time scales of these data series were obtained,and the relationship between bank-full discharge and inflow conditions under the same time scale was analyzed using the method of continuous wavelet analysis.Results show that the bank-full discharge of selected stations in the lower Yellow River have main time scales of 5-6 years and 19-20 years.In addition,the multiple time scales phenomenon at selected stations in the upper Yellow River and lower Wei River was also analyzed.A phase difference between bank-full discharge and sediment concentration was founded,with its value being different at different river reaches.Moreover,it was founded that the delayed time decreases as the annual sediment concentration increase.The phenomenon of multiple time scales of inflow condition and bank-full discharge in the Yellow River investigated in this paper is helpful for the study of multiple time scales existing in fluvial processes.
What problem does this paper attempt to address?