Job scheduling optimization in multi-shuttle automated storage and retrieval system

Peng YANG,Li-xin MIAO,Lei QIN
DOI: https://doi.org/10.13196/j.cims.2013.07.188.yangp.004
2013-01-01
Computer Integrated Manufacturing Systems
Abstract:To improve the operation efficiency of multi-shuttle Automated Storage and Retrieval System(AS/RS)in term of job scheduling,a mathematical model for job scheduling optimization was established according to the operational characteristic of multi-shuttle AS/RS.The job scheduling problem was proved to be NP-hard after complexity analysis,and a genetic simulated annealing algorithm was developed to solve this NP-hard problem.The performance of proposed algorithm was demonstrated by numerical examples,and the results showed that the algorithm had better solution precision and efficiency.The travel time of performing storage and retrieval operations was reduced effectively by this algorithm.
What problem does this paper attempt to address?