A New Grounding Device for Grounding Systems in the Ge-La Section of the Qinghai-Tibet Railway

FU Long-hai,WU Guang-ning,WANG Hao,LI Jin
DOI: https://doi.org/10.3321/j.issn:1001-8360.2006.02.009
2006-01-01
Abstract:The Qinghai-Tibet Railway Ge-La Section passes through the large-area permafrost of the Qinghai-Tibet Plateau which is featured by high soil resistivities.This unprecedentedly challenges design and construction of the power supply grounding system at substations and along transmission lines.A new grounding device(the resistance-reducing module) is introduced to reduce the grounding resistances and adapt to the local environment.The device has low self-resistance and contact and dispersed resistances reduced by improving soil contact and enlarging equivalent radii.The assistant method of changing the soil around the grounding device is adopted to better the resistance lowering capability.The formula for calculating the module grounding resistance is given.The influence of the changing number of the resistance-reducing modules on the utilization coefficients of the grounding system and also the changing rule of the utilization coefficients are analyzed.Simulation and site tests show that the new device has better dispersing feature and stronger resistance-reducing capability and is convenient in construction.So it is a new option for the grounding devices to be used along the Qinghai-Tibet Railway.
What problem does this paper attempt to address?