Lot Sizing Problem in a JIT System with Time-Varying Delivery

王海英,丁华,张翠华,王冰,杨明
DOI: https://doi.org/10.16381/j.cnki.issn1003-207x.2012.05.015
2012-01-01
Abstract:A serial supply chain which consists of a raw material supplier, a manufacturer, a distribution center and a retailer is considered in this paper. Time-varying delivery is in the presence between manufac turer facility and the retailer warehouse in the supply chain. Delivery time function is developed based on practical data analysis. The total cost model is derived and a new search algorithm is established. The cor- responding Decision Support System is developed by using Active X technology to embed matlab in visual basic. Finally, sensitivity analysis is made to help decision makers achieve a lower total cost in practice.
What problem does this paper attempt to address?