Research on Capital Allocation of Power Producer

FENG Dong-han,GAN De-qiang
DOI: https://doi.org/10.3321/j.issn:1000-1026.2005.24.003
2005-01-01
Abstract:The decision-making problem that an IPP (Independent Power Producer) faces can be divided into 3 stages, viz. investment decision, capital allocation and strategic bidding. Capital allocation is as important as the other two and has significant impact on the IPP's utility function. Based on the recent research achievements in the field of securities investment, a method is proposed for the remodeling of electricity market, and the reliability and validity of the method are roundly examined. To demonstrate the practicality of the method proposed, the actual electric price data of a real world electricity market PJM are used in the numeric examples. The results of base case and extensive calculation show that different capital allocation solutions can make big difference for the generators' profits and risks, and the capital allocation method proposed is practical, effective and potentially very useful
What problem does this paper attempt to address?