Application of Multivariate Gray Model in Prediction of Deep-Mixing Pile Compound Roadbed Settlement
Bin CHEN,Xiao-dong CHEN,Yi-ping ZHANG
DOI: https://doi.org/10.3969/j.issn.1008-0562.2007.03.019
2007-01-01
Abstract:A new method to forecast after-construction settlement of compound roadbed is put forward.Firstly,by means of roadbed monitoring-item’s gray associate analysis,optimal selection of variables such as shoulder horizontal displacement,pore water pressure slaking valuation,pile body strain and so on,can be made.Secondly,using the variables selected in step 1,the MGM(1,n) model and its corresponding forecast equation can be established.Thirdly,considering the effect of monitoring-item’s unequal time-interval,the model established can be consummated and improved.Finally,by using the established model,the settlement of soft roadbed can be accurately forecast.As a case study,a practical example is given,which indicates the method can make use of monitoring data more fully,and can forecast after-construction settlement more effectively.