Disruption Management on Unrelated Machines Scheduling Considering Modification of Machine's Production Rate

LIU Feng,WANG Jian-jun,YANG De-li,ZOU Zong-bao
DOI: https://doi.org/10.3969/j.issn.1007-3221.2013.03.028
2013-01-01
Abstract:In unrelated machines scheduling,the initial schedule which minimizes production cost is no longer optimal due to emergent rate-modifying disruptions.A decision-maker needs to adjust the initial optimal schedule and balance between production costs and disruption-caused deviations.A rescheduling model is established which considers both the production costs and deviations.The former objective is total machine load and the latter objective is job's reassignment costs among different machines.An algorithm for obtaining the Pareto front of rescheduling problem is designed.Moreover,by transforming two objectives into one non-linear binary function based on decision-maker's preference,the algorithm which optimizes the binary function and returns a Pareto solution is developed.In numerical experiments compared with whole Pareto front,the algorithm optimizing binary function only needs to search a small portion of Pareto front.The percentage of Pareto solutions searched and CPU running time is greatly reduced,and the efficiency of problem-solving is improved.
What problem does this paper attempt to address?