Notes on “the Common Due-Date Early/tardy Scheduling Problem on a Parallel Machine under the Effects of Time-Dependent Learning and Linear and Nonlinear Deterioration”

Yunqiang Yin,Dehua Xu,Xiaokun Huang
DOI: https://doi.org/10.1016/j.eswa.2010.12.157
IF: 8.5
2011-01-01
Expert Systems with Applications
Abstract:We show by an example that Theorems 1 and 2 in Toksarı and Güner [Toksarı, M. T., & Güner, E. (2010). The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration. Expert Systems with Applications 37, 92–112.] are incorrect.
What problem does this paper attempt to address?