Feasibility analysis of virtual clean hydrogen plant platform: A case study on energy policy in S. Korea using stochastic programming

Yeong Geon Son,Sung-Yul Kim
DOI: https://doi.org/10.1016/j.egyr.2024.05.039
IF: 5.2
2024-06-01
Energy Reports
Abstract:In S. Korea, high-density renewable and high-density load areas are separate. This separation has led to increased transmission constraints. As both Renewable Energy Source (RES) penetration and power demand simultaneously increase, RES saturation occurs. This phenomenon reduces both the benefits of power transactions and the acceptance of RES. Addressing this issue requires actions from Independent Power Producers (IPP) and policymakers. This paper suggests a Virtual Clean Hydrogen Plant (VCHP) platform design that consolidates the Photovoltaic (PV) energy from high-density renewable areas into a single power plant. The platform converts excess energy, generated by PV due to transmission constraints, into hydrogen and supplies it to the high-density load areas. The South Korean government plans to introduce a Clean Hydrogen Portfolio Standard (CHPS), which offers a fixed premium (FP) to private power generators that provide power through clean hydrogen. Consequently, the proposed benefit structure of the VCHP platform includes an FP, settled through CHPS. This paper's design and operation algorithm for the VCHP platform incorporates stochastic programming to analyze PV operation and deterministic optimization for the optimal scheduling of Fuel Cells (FC) that provide power and heat to high-density load areas. The simulation results demonstrate that the minimum subsidy required for CHPS benefits varies depending on how PV-coupled P2G technology is utilized. Specifically, engaging in net metering with VCHP over the course of one month can establish a cost-effective benefit structure, verified to require a subsidy ranging from a minimum of 0.2036 /kWh.
energy & fuels
What problem does this paper attempt to address?