Performance evaluation of a commercial de-icing system in one year operation of a windfarm

K. Gkarakis
Abstract:In this paper, a windfarm with seven 3MW windturbines equipped with rotor blade heating located in Central Greece at approximately 1100m asl, is monitored for one complete year in order to evaluate the performance under icing conditions. The windturbines are equipped with a commercial active de-icing system which could reduce the downtime due to icing, by heating the rotor blades by re-circulating heated air. This melts the ice at an early stage and the windturbine is operational sooner. The operational data of the windturbines and the reference onsite meteorological mast were examined. Analyses are performed for the mild winter 2015-6, from 1 November to 31 March. The analyses are based on operational data of the windturbines (wind speed, wind direction, operation status, ambient, blades and nacelle temperatures, rotor speed, produced capacity, consumed energy) and the onsite meteorological mast (wind speed/direction and temperature). Furthermore, for a month the de-icing system of one windturbine de-activated, so to be examined in detail the operational performance and to be extracted the energy production loss. In the certain windfarm the theoretical increase of the energy production has estimated approximately 11,5% (in the limits of the 9-12% from relative literature) but in reality the percentage was approximately 6% due to time periods that the system was not be able to defrost satisfactorily the blades and after few minutes the windturbines stopped. Possible reason is the method of the ice detection and the high rate of icing due to existing humidity. Based on the final gain in production, during the studied time period, the system is profitable and the payback period is less than a year. The energy consumption of the system is much lower than the gain in energy production.
Environmental Science,Engineering
What problem does this paper attempt to address?