Correction to "Energy-Oriented Scheduling for Hybrid Flow Shop With Limited Buffers Through Efficient Multi-Objective Optimization"

Sheng-Long Jiang,Long Zhang
DOI: https://doi.org/10.1109/access.2022.3169583
IF: 3.9
2022-05-06
IEEE Access
Abstract:In the above article [1], the grant number of the National Natural Science Foundation of China (NSFC) is an error.
computer science, information systems,telecommunications,engineering, electrical & electronic
What problem does this paper attempt to address?