Planning and evaluation of the university green canteen construction development project

Atia Sonda,Akbar Gunawan,Sirajuddin,Ardenta Toga Prawira
DOI: https://doi.org/10.1063/5.0201829
Cités
Abstract:. The construction of a green concept canteen on campus is very important as a form of environmental protection and preservation. The construction planning of a green campus canteen includes four main activities: preparatory activities, structural work, architectural work, and mechanical work. So far, development projects executed by third parties often have delays from the schedule, therefore the construction needs to be carefully planned so the construction development can be executed efficiently, effectively, and finished on time. The delay of the project itself is a situation that should be avoided by all parties as much as possible. Therefore, this study will provide a planning concept and evaluation method for the development of a green canteen project using the Critical Part Method (CPM) and PERT (Project Evaluation and Review Technique) methods. CPM and PERT methods are used to get a realistic fastest time to finish a project. This research method is performed by processing the information derived from the project’s schedule and seeking information from related workers and then processing the information using standard CPM and PERT methods. The results of the fastest construction project networks are A-B-C-D-E-F-G-M-U-V or A-B-C-D-E-F-H-M-U-V or A-B-C-D-E-N-O-R-U-V. The optimal time for completing the green canteen construction project is 195.76~196 days from the project target of 165.58~165 days. Whereas, Cost estimation can be can decrease or increase based on probability using the PERT method until Rp. 647,624,047.
Environmental Science,Engineering
What problem does this paper attempt to address?