Approximation algorithms for the joint replenishment problem with deadlines

Marcin Bienkowski,Jarosław Byrka,Marek Chrobak,Neil Dobbs,Tomasz Nowicki,Maxim Sviridenko,Grzegorz Świrszcz,Neal E. Young
DOI: https://doi.org/10.1007/s10951-014-0392-y
2014-08-27
Journal of Scheduling
Abstract:The Joint Replenishment Problem (JRP$${\hbox {JRP}}$$) is a fundamental optimization problem in supply-chain management, concerned with optimizing the flow of goods from a supplier to retailers. Over time, in response to demands at the retailers, the supplier ships orders, via a warehouse, to the retailers. The objective is to schedule these orders to minimize the sum of ordering costs and retailers’ waiting costs. We study the approximability of JRP-D$${\hbox {JRP-D}}$$, the version of JRP$${\hbox {JRP}}$$ with deadlines, where instead of waiting costs the retailers impose strict deadlines. We study the integrality gap of the standard linear-program (LP) relaxation, giving a lower bound of 1.207$$1.207$$, a stronger, computer-assisted lower bound of 1.245$$1.245$$, as well as an upper bound and approximation ratio of 1.574$$1.574$$. The best previous upper bound and approximation ratio was 1.667$$1.667$$; no lower bound was previously published. For the special case when all demand periods are of equal length, we give an upper bound of 1.5$$1.5$$, a lower bound of 1.2$$1.2$$, and show APX-hardness.
engineering, manufacturing,operations research & management science
What problem does this paper attempt to address?