Case study on the secondary support time and optimization of combined support for a roadway under high in-situ stress

Weile Geng,Wensong Wang,Gun Huang,Changbao Jiang,Zhenlong Song,Shengli Guo,Ziwen Dong
DOI: https://doi.org/10.1007/s40948-024-00774-w
2024-03-26
Geomechanics and Geophysics for Geo-Energy and Geo-Resources
Abstract:Roadway support can effectively improve the stability of roadway excavation and ensure the safety of underground mining. This study investigates the secondary support time and parameter optimization of combined support for a deep roadway in the stage of resource replacement in the Huize lead–zinc mine in Yunnan Province, China. The aim of this study is to increase the stability and safety of the roadway and decrease the cost of support. Research on support methods and failure modes has shown that under the action of high in-situ stress in deep mining, the surrounding rock of the roadway exhibits obvious rheological phenomena. The change in the radial displacement of the roadway is combined with creep tests of the main exposed surrounding rock to determine the secondary support time. Numerical simulations and orthogonal tests are utilized to optimize the support parameters in terms of the roof subsidence, floor heave displacement, side displacement, and plastic zone by analyzing the effects of the sprayed concrete thickness, bolt length, bolt row spacing, and bolt diameter on the support results. The proposed secondary support time and combined parameters can provide a reference for roadway support in similar strata.
energy & fuels,geosciences, multidisciplinary,engineering, geological
What problem does this paper attempt to address?
This paper aims to solve the problems of support time and parameter optimization of deep roadways under high initial stress conditions. Specifically: 1. **Research Background**: With the continuous mining of mineral resources, shallow - layer resources are gradually depleted, and mining activities are turning to deep - layer resources. In China, many mines have entered the deep - resource mining stage, and the maximum mining depth of about 60 mines exceeds 1 kilometer. During the deep - mining process, roadway engineering not only undertakes the tasks of mining and transportation, but also is responsible for geological exploration and ore - body exploration. However, under high initial stress and high - temperature environments, the mechanical properties of deep - seated rock masses may change from rigid to flexible and show obvious rheological phenomena, especially more significant in soft rocks and fracture zones. These rheological characteristics lead to the gradual increase of roadway deformation, and the surrounding rock may be damaged due to the release of stored plastic strain energy, thereby affecting the stability of roadway support. 2. **Research Objectives**: By studying the secondary support time and combined support parameter optimization of deep roadways in the resource replacement stage of Huize Lead - Zinc Mine in Yunnan, this paper aims to improve the stability and safety of roadways and reduce support costs at the same time. The research contents include: - **Field Investigation and Preliminary Design**: Analyze the effects of existing support methods and conduct rheological tests on surrounding rocks to determine the secondary support time. - **Determination of Secondary Support Time**: Determine a reasonable secondary support time through rheological tests and the change of radial displacement of surrounding rocks. - **Support Parameter Optimization**: Use numerical simulation and orthogonal tests to optimize support parameters such as shotcrete thickness, bolt length, bolt row spacing and bolt diameter. 3. **Research Methods**: - **Rheological Test**: Use the MTS 815 rock mechanics testing machine to conduct rheological tests on exposed surrounding rocks to obtain the stable creep rate under different stress conditions. - **Numerical Simulation**: Use FLAC3D software to establish a calculation model to simulate the deformation of roadway surrounding rocks and the expansion of plastic zones. - **Orthogonal Test**: Optimize support parameters through orthogonal test design and select the optimal support scheme. 4. **Research Results**: - **Secondary Support Time**: According to the results of rheological tests, when the maximum horizontal initial stress of the roadway is 41.5 MPa, the reasonable secondary support time is 170 hours. - **Support Parameter Optimization**: Through orthogonal tests and numerical simulations, the optimal combination of support parameters is obtained, including a shotcrete thickness of 140 mm, a bolt length of 2.0 m, a bolt row spacing of 1.0 m and a bolt diameter of 44 mm. In conclusion, through a systematic method, this research has solved the problems of support time and parameter optimization of deep roadways under high initial stress conditions, providing a technical reference for roadway support under similar geological conditions.