Abstract:Unit commitment problem considering renewable uncertainty has received a lot of attention in recent years. The high-level penetration of renewable lowers the system inertia, posing challenges to frequency stability. This work proposes a unit commitment model considering frequency limits. The High Voltage Direct Current (HVDC) tie-line is modeled to transfer PV generation to load centers while providing frequency support. A multi-machine system frequency response model is employed to approximate frequency excursion. PV is considered semi-controllable in the scheduling model. A novel solution approach is proposed to solve the unit commitment problem with nonlinear frequency stability constraints. Case studies demonstrate the benefits and effectiveness of the proposed approach.
engineering, electrical & electronic
What problem does this paper attempt to address?