Safety risk assessment of sustainable construction based on projection pursuit model optimized by multi-intelligent algorithm: a case study of new chemical projects

Weiyi Ju,Zhixiang Xing,Mustafa Shinwari
DOI: https://doi.org/10.1007/s11356-023-31464-x
Abstract:With the rapid development of urban and social economies, the safety accidents in the construction process of the new chemical plant have caused huge losses to the city. The purpose of this study is to evaluate the risks in the construction process of chemical projects and propose preventive measures. A novel risk assessment model based on multi-intelligence algorithm optimization projection pursuit was developed to assess the construction safety risk and determine the risk level. In this model, the best-worst method and the entropy weight method were used as subjective and objective evaluation methods, respectively. The theory based on the idea of the distance function was applied to the model to calculate the combined weight value. The results showed that the three evaluation objects with the highest risk value were the air compression station plant, regional control room, and hazardous and solid waste temporary repository. The risk values of these three buildings were 2.2557, 2.2160, and 2.1654, respectively, and the corresponding risk level was high. On-site safety managers should take immediate measures in these high-risk buildings to reduce the possibility of accidents. This study is a new attempt to consider the construction safety risk of the new chemical project.
What problem does this paper attempt to address?