Formation of pit lake and slope stability following mine closure: a case study of Fushun West Open-pit Mine

Yuan Gao,Jinduo Li,Tianhong Yang,Lei Meng,Wenxue Deng,Penghai Zhang
DOI: https://doi.org/10.1080/19475705.2024.2340612
2024-04-13
Geomatics Natural Hazards and Risk
Abstract:The Fushun West Open-pit Mine, recognized as Asia's largest open-pit coal mine, transitioned to a closure management phase following the cessation of operations in 2019. This study presents a quantitative analysis of the water inflow sources by meticulously reviewing historical data on the mine's drainage system and the hydrogeological conditions of the mining area. A numerical model representing the unsaturated-saturated groundwater dynamics was constructed to illustrate the spatial distribution of the groundwater flow. Employing the water storage analysis module within the WebGIS system, projections were made regarding the natural water accumulation process at varying water levels. The results indicate that, under natural conditions, an estimated 48 years would be required to reach a water level elevation of 50 m. However, this timeframe could be drastically reduced to approximately 3.3 years by implementing an accelerated filling strategy that channels water from the Hun River. Numerical simulations elucidate the failure mechanism of the water-sensitive slope on the northern bank during the water storage process, as well as the potential impact on the slopes above the water level. This comprehensive approach provides critical insights for managing decommissioned open-pit mines and optimizing water storage schemes.
geosciences, multidisciplinary,meteorology & atmospheric sciences,water resources
What problem does this paper attempt to address?
The main problem that this paper attempts to solve is to study the formation process of the pit lake after the closure of Fushun West Open - pit Mine and its impact on slope stability. Specifically: 1. **Formation process of the pit lake**: Through detailed hydro - geological condition analysis and numerical simulation, the paper explores the formation process of the pit lake under natural conditions and with the adoption of the accelerated water - filling strategy. The study found that under natural conditions, it is expected to take about 48 years to reach a water level height of 50 meters; while by diverting water from the Hun River to implement the accelerated water - filling strategy, this time can be shortened to about 3.3 years. 2. **Slope stability analysis**: The paper also evaluates the stability of water - sensitive slopes during the formation process of the pit lake, especially the potential instability mechanism of the northern slope during the water level rise and its impact on the slope above the water level. Research shows that the restoration of the groundwater level increases the pore water pressure in the slope rock mass, which may lead to the submergence of rock layer fractures, thereby reducing its shear strength and affecting the slope stability. Through these studies, the paper provides important scientific basis and technical support for the ecological restoration and water resource management of abandoned open - pit mines, helps to optimize the water - filling scheme of the pit lake, and proposes targeted treatment measures to mitigate potential problems.