A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints

B. Joo,Yeong-Dae Kim
DOI: https://doi.org/10.1057/palgrave.jors.2602598
IF: 3.6
2009-04-01
Journal of the Operational Research Society
Abstract:
What problem does this paper attempt to address?