Transforming existing 220 kV double circuit line into 400 kV single circuit line in Romania

D. Marginean,E. Mateescu,H. Wechsler,G. Florea,C. Matea
DOI: https://doi.org/10.1109/TDCLLM.2011.6042241
2011-05-16
Abstract:The transmission system operators TRANSELECTRICA (TEL-Romania) and EMS (Serbia) have decided to increase the interconnection capacity on the common border by building a new 400 kV transmission line.
What problem does this paper attempt to address?