MATLAB realization and optimization of network planning technology node parameters and the critical path

Liu Lu
Abstract:The network-based planning techniques already widely applied in each management domain,became one of commonly used scientific management methods,each node time parameter and the critical path determination is extremely important.The essential way determination is generally transforms as the most short-path,then solves,using the Floyd algorithm.This article applies the network chart the matrix method of portrayal solution node time parameter and the essential way,finally realizes the algorithm through the MATLAB language.The article has also established the mathematical model which the network optimizes.
Engineering,Computer Science
What problem does this paper attempt to address?