Beam dynamic issues in the bepcii luminosity commissioning*
Q. Qin,Z. Duan,N. Huang,D. H. Ji,Y. Jiao,Y. D. Liu,Y. M. Peng,D. Wang,J. Q. Wang,N. Wang,X. H. Wang,Y. Y. Wei,X. M. Wen,J. Xing,G. Xu,C. H. Yu,C. Zhang,Y. Zhang,P. R. China
2010-01-01
Abstract:As a τ-charm factory like collider, the upgrade project of the Beijing Electron Positron Collider (BEPCII), has reached 1/3 of the design luminosity. During the luminosity commissioning, beam optics recovery, machine parameters measurement, detector solenoid compensation, and instability cure are main problems we met. Besides commissioning the machine, beams were delivered to the users from high energy physics and synchrotron radiation. This paper summarizes the accelerator physics issues in the BEPCII luminosity commissioning from 2009. INTRODUCTION BEPCII was designed as a factory-like collider with a design luminosity of 1×10cms at the beam energy of 1.89GeV. It is characterized as “one machine, two purposes”, which means to provide beam not only for high energy physics experiment, but also for synchrotron radiation (SR) users in parasitic or dedicated mode. Using the BEPC tunnel, BEPCII keeps the linac and two transport lines same as BEPC, but was upgraded as two rings in parallel to store e and e beams, respectively, and named as BER and BPR. The two halves of the outer rings are connected as an SR ring, the third ring named as BSR, with 9 beam lines extracted from 5 wigglers, and other 6 beam lines from bending magnets. To save the budget, all the beam line extraction ports are kept the same as BEPC. The layout of BEPCII is shown in Fig. 1.