Integrated Process Planning and Scheduling and Multimode Resource Constrained Project Scheduling: Ship Block Assembly Application

R. Y. Qassim
DOI: https://doi.org/10.5772/35605
2012-05-16
Abstract:Planning and scheduling are two major tasks in manufacturing system management, which have a direct bearing on the competitive position of enterprises inserted in diverse manufacturing fields, such as the chemical, aerospace, semiconductor, and shipbuilding industries. Inadequate planning and scheduling are considered to be a major cause of the gap between desired and actual enterprise manufacturing performance in terms of inventory level, throughput, manufacturing cost, and facility location. In order to bridge this gap, not only a feasible but also an optimal production network and supply chain schedule is required, which satisfies all types of constraints within the manufacturing – marketing environment, with a view to achieving what has become known as enterprisewide optimisation (EWO). Until the start of the last decade, the focus of most multiple facility production firms operating at multiple sites has been on operations optimisation at the single facility level. Solutions obtained at this level are suboptimal at the multiple facility level. In order to obtain an optimal solution at the latter level, the scope of optimisation must be enlarged to model the multiple facility supply chain of the enterprise as a whole, including the interaction with suppliers and customers; see for example (Lainez et al., 2010), Munoz et al. , (2011), Stray et al., (2006), and Monostori et al., (2010).
What problem does this paper attempt to address?