Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach

Ali Bayesteh,Ming Lu,Prasanna Lakshminarasimhan
DOI: https://doi.org/10.3846/jcem.2024.21744
2024-10-12
Journal of Civil Engineering and Management
Abstract:This paper proposes a streamlined approach to addressing the problem of allocating finite crew resources to concurrent jobs in the context of municipal drainage infrastructure maintenance. The problem was defined from the perspective of a project manager involved in planning such operations on a day-by-day basis. The problem statement was then transformed into a simplified Integer Linear Programming optimization model. Performance metrics were devised to evaluate the optimization model's effectiveness. A heuristic algorithm representing the decision-making process by a seasoned planner in the partner company was also developed. Both methods were applied to a case study and contrasted based on the same performance metrics. The findings underscored substantial optimization benefits in rendering decision support in resource-constrained drainage construction operations planning. In conclusion, this research presents an alternative strategy for navigating the complexities inherent in finite crew resource allocation on multiple concurrent drainage projects; lends a cost-effective optimization solution to improving the utilization of finite available crews while satisfying service demands from multiple clients to the largest extent possible.
engineering, civil
What problem does this paper attempt to address?