Abstract:Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids, sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated microgrids. In DER-aided blackstart, the continuous operation of these microgrids is uncertain due to the finite energy capacity of commonly used blackstart units, such as battery energy storage (BES)-based grid-forming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between microgrids and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition was developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottom-up blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. The proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.
What problem does this paper attempt to address?
The problem that this paper attempts to solve is how to effectively restore the power supply of the distribution system (DS) after a long - term power outage caused by extreme weather events. Specifically, the article proposes a comprehensive black - start and load restoration framework, aiming to solve the following problems:
1. **Limitations of existing black - start methods**:
- Existing black - start methods usually rely on diesel generators (DGs), which are not only costly but also difficult to ensure continuous power supply after a long - term power outage.
- When using battery energy storage systems (BES) as black - start units, due to their limited energy capacity, micro - grids may not be able to operate continuously.
2. **Synchronization and frequency security constraints**:
- During the black - start process, multiple micro - grids need to be synchronized and finally synchronized with the transmission grid (TG) to ensure continuous operation. However, existing black - start methods often overlook this point.
- In order to ensure the safe operation of micro - grids, the safety limits of frequency response, such as RoCoF (rate of change of frequency) and frequency nadir (the lowest frequency point), must be considered.
3. **Optimizing the black - start and load restoration process**:
- A method is needed that can effectively utilize distributed energy resources (DERs), especially BES - based grid - forming inverters (GFMIs) and grid - following inverters (GFLIs), for black - start and load restoration.
- This method should be able to optimize the decision sequence of synchronization switches and activation switches, ensure maximizing cold - load pick - up (CLPU) under the premise of meeting frequency security constraints, and gradually expand the micro - grid boundaries to achieve synchronization with the transmission grid.
### Main contributions of the paper
- **Proposing a bottom - up black - start and load restoration framework**: This framework uses BES - based GFMIs for black - start, and expands the micro - grid boundaries by optimizing the activation paths and synchronization decisions, and finally synchronizes with the transmission grid.
- **Introducing virtual synchronous generator (VSG) control characteristics**: Through VSG parameters (such as inertia constant and droop coefficient), estimate the frequency response of GFMIs to cold - load pick - up, including quasi - steady - state frequency, RoCoF and frequency nadir.
- **Modeling synchronization switches (SSWs)**: Design synchronization conditions so that the operations of these switches are consistent with the branch power flow model of DS and support the synchronization between micro - grids.
- **Dynamic radial constraints**: Allow GFMIs to change the root node state, support micro - grids to expand and integrate boundaries during the black - start process.
### Examples of mathematical formulas
1. **Voltage and frequency control of GFMI**:
\[
v_{i,n,t}=(V^*)^2+\Delta v_{cc,i,t}, \quad \forall i\in R, n\in\Phi
\]
\[
f_{i,t}=f^*\left(1 - \frac{\sum_{n\in\Phi}p_{ES,i,n,t}}{S_{rat,i}(D_i + K_f)}\right), \quad \forall i\in R
\]
2. **Rate of change of frequency (RoCoF) and frequency nadir**:
\[
\dot{f}_{i,t}=\frac{\sum_{n\in\Phi}\Delta P_{ES,i,n,t}}{2S_{rat,i}H_i}
\]
\[
f_{nad,i,t}=f_{i,t}-f^*\frac{\sum_{n\in\Phi}\Delta P_{ES,i,n,t}}{S_{rat,i}(D_i + K_f)(1 + \gamma_i)}
\]
Through these improvements, this paper provides a more efficient and safe black - start and load restoration scheme for distribution systems, especially suitable for modern power systems with a large number of distributed energy resources.