BIM-based detection and optimization of spatial-temporal clashes in underground pipeline construction

Jun Yin,Sang Luo,Jianqiu Rui,Jinyue Yao,Fang Zhang,Boyang Fu,Mohamad Kassem
DOI: https://doi.org/10.1016/j.autcon.2024.105616
IF: 10.3
2024-07-20
Automation in Construction
Abstract:Underground projects typically involve a multi-staged relocation of multidisciplinary pipelines, presenting a risk of spatial-temporal clashes. Existing solutions lack the capability for efficient and effective identification and resolution of these clashes. This paper presents an approach that incorporates a BIM-based tool and an optimization algorithm to detect and resolve spatial-temporal clashes in underground pipelines. The approach defines two categories of underground pipeline clashes: Type I (i.e. spatial clash) and Type II (i.e. spatial-temporal clash), with an in-depth exploration of the underlying mechanisms of Type II. A 4D detection methodology was implemented to identify the spatial-temporal clashes, and a construction scheduling optimization model based on the mixed-integer linear programming (MILP) problem was proposed to resolve these clashes. The proposed approach, evaluated using data from a real-world underground pipeline project, successfully reduced the incidence of spatial-temporal clashes from 45.5% to 0%, indicating significant potential for enhancing construction schedule performance.
construction & building technology,engineering, civil
What problem does this paper attempt to address?